The World’s Leading Supplier of AAC Whole Line System
Home » Products » Pouring & Pre-curing Section » Pre-curing System » Pre-curing system

Pre-curing system

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button
Pre-curing system: The slurry material in the mould is carried by the ferry cart to the pre-curing area. The pre-curing processing will take 2-3 hours, at this section, the material will turn to solid state from soft, to meet the required hardness.
Availability:

The pre-curing cart is a widely used to convey the mould after pouring to the the pre-curing room, and then convey the mould to be cut.  It is a key products in the pre-curing system.


The pre-curing ferry catr can realize the horizontal transfer of a large amount of materials in the production of aerated concrete, which can increase the speed of material turnover and improve the efficiency of production and operation.



Previous: 
Next: 
Contact Us

The main product of TEEYER is the whole line equipment for AAC block and panel production. TEEYER aims to provide customers with satisfactory overall solution for wall material products.

Product Category

Quick Links

Information

 Tel: +86-13861131181
 Address: No.312 West Hehai Rd, Hi-tech Zone, Changzhou City, Jiangsu Province, China.

Copyright© 2022 Jiangsu Teeyer Intelligent Equipment Co., Ltd. All Rights Reserved. Support by LeadongSitemap